Installation reports

Screw pile installation report, done on site

Every pile you log in Pile Logix goes straight into a clean installation report. When the last pile is in, download the PDF and email it to the engineer or certifier yourself.

What's in the report

The report header comes from the job and your business profile. You fill it in once and it's saved for next time.

  • Your business header and logo at the top
  • Customer and job address
  • Install date and installers
  • Pile specification, for example shaft size, wall thickness and helix size
  • Auger torque spec for the drive head you used
  • Optional installer notes for the engineer

Then there's one row for every pile:

ColumnWhat it records
Location no.The pile number, matching the plan
Final depthHow deep the pile actually went
Expected depthThe design depth for that pile
1st and 2nd extensionExtension lengths added, in metres
Cut lengthHow much was cut off the top
Machine PSIThe hydraulic pressure reading at final depth
Torque (Nm)Installation torque
Predrill depth / commentPredrilling, rock, refusal or anything else worth noting
Sample screw pile installation report PDF from Pile Logix showing final and expected depth, extensions, cut length, machine PSI and torque for each pile
A real installation report from Pile Logix. Customer, address and business details have been hidden.

Why engineers and certifiers want it

The engineer signs off on what went in the ground. They want every pile accounted for, with depth and torque next to the design numbers so they can see at a glance whether each one hit spec. A handwritten sheet copied up at night is slow to check and easy to get wrong.

  • Same layout every job. The engineer knows where to look.
  • Design next to actual. Expected and final depth sit side by side for every pile.
  • Logged on site. Readings go in as each pile goes in, not from memory at the end of the day.
  • Ready when you finish. No typing it up. Download the PDF before you leave site.

Related guide: What engineers and certifiers check in a screw pile installation report

For measurement intervals, pressure-based estimates and supporting evidence, see how to record screw pile torque readings.

How you send it

Pile Logix gives you the PDF. You download it and email it to the engineer, certifier or builder yourself, the same way you'd send any other document. You stay in control of who gets it.

Not using software yet? Start with our free screw pile record sheet template, or see how the pile logging app works.

Get your next report done on site

Start the 14-day free trial, no credit card needed, and download your first installation report on a real job.